When the boiler that heats your building reaches end of life, the replacement is an engineering project — not a swap. Com+ Mechanical sizes, coordinates permits for, and installs hydronic and steam boilers across the five boroughs and the surrounding metro, with near-boiler piping and controls done right the first time. From single low-pressure units to multi-boiler plant modernizations, we keep tenants warm and your building inspection-ready.
Water pooling under a sectional boiler or steam escaping between sections signals a cracked block from thermal-shock cycling or chronic low water. Sections are not field-repairable on a commercial unit — once one fails, replacement is the only safe path.
Sustained flue-gas condensation in a non-condensing steel boiler rots the fire tubes and tube sheet from the inside. You'll see rust streaks at the flue, sooting, and rising stack temperatures as heat transfer degrades — a classic end-of-life indicator.
Carryover, water hammer, and banging mains often trace back to a tired boiler with failed near-boiler piping, undersized header, or a waterlogged block. When skimming and a low-water-cutoff swap no longer hold it, the boiler is done.
A DOB boiler inspector red-tagging the unit for a wasted block, unsafe controls, or refractory failure forces action on a deadline. We replace the unit and coordinate the re-inspection so the building stays legally heated.
A 60–70% seasonal-efficiency atmospheric boiler bleeds money against a modern 90%+ condensing or modulating unit. On No. 4 or No. 6 oil, the gap is even larger and now carries Local Law 97 carbon exposure on top of fuel cost.
Crumbling refractory, a flame that won't stabilize, and a burner that short-cycles on limit point to a combustion chamber and control package past their service life — driving up wear, fuel use, and the risk of an unplanned mid-winter shutdown.
A failing commercial boiler rarely fails in isolation. By the time a cast-iron sectional cracks, a fire-tube heat exchanger corrodes through, or a steam block starts flooding the building, the near-boiler piping, controls, venting, and combustion air are usually overdue as well. Com+ Mechanical approaches every replacement as a full boiler-room project: we start with a measured heat-loss and EDR analysis so the new unit is right-sized rather than blindly matched to the old nameplate, then lay out the venting, gas train, condensate handling, and primary/secondary or steam header piping around it, coordinated with a licensed Professional Engineer. We install high-efficiency condensing and modulating hydronic boilers, conventional cast-iron and steel firebox units, and low- and high-pressure steam boilers — and we coordinate the NYC DOB boiler permits with a licensed Professional Engineer, perform combustion testing, and coordinate the inspection sign-off that a commercial install legally requires. The result is a plant that holds setpoint on the coldest design day, runs efficiently against rising fuel and carbon costs, and passes its periodic boiler inspection without drama.
From call to comfort in 4 easy steps
We survey the boiler room, fuel supply, venting, and distribution, then run a heat-loss (hydronic) or connected-EDR (steam) calculation to size the new unit to the building's true load and recommend the right boiler type and efficiency tier.
We lay out the near-boiler piping, venting, gas train, and controls with a licensed Professional Engineer, scope the project into a fixed proposal, and coordinate the required NYC DOB boiler and work permits with licensed Professional Engineers before any equipment is set.
We rig out the old boiler, install and pipe the new unit, rebuild venting and combustion air, wire the controls and any BMS integration, and sequence the work to keep heat-off time to a minimum for occupants.
We perform combustion analysis, set the burner, verify all safety lockouts, and walk the operating staff through the controls — then coordinate the DOB inspection and hand over documentation for your records.
Closed-loop hot-water systems serving baseboard, fin-tube, radiant, or air-handler coils — the most common configuration in modern commercial buildings and the easiest to drive to high efficiency.
One- and two-pipe steam systems common in older NYC apartment and institutional buildings, where correct near-boiler piping and header design are critical to dry, stable steam.
Replacements paired with conversion off heavy oil to natural gas or dual-fuel firing — a frequent driver for NYC buildings phasing out No. 4 and No. 6 oil for cost and emissions reasons.
We work on hydronic and steam plants — fire-tube, cast-iron sectional, condensing, and low- and high-pressure steam — across apartment buildings, offices, schools, and mixed-use properties throughout the metro.
We coordinate NYC DOB boiler and work permits with licensed Professional Engineers, build to code, and coordinate inspection sign-off so your replacement is documented — not a liability waiting on the next periodic inspection.
A boiler that drops in January is a tenant emergency. Our team responds around the clock, and we can stage temporary heat or expedite a changeover to keep your building occupied.
Managing heat across multiple buildings, we standardize equipment, consolidate boiler-room scopes, and keep one point of contact for replacements, agreements, and emergencies across your entire portfolio.
No fees. No surprises. Just honest service.
On-site evaluation of your existing plant with a measured heat-loss or EDR sizing analysis and a written replacement recommendation.
Turnkey removal and installation of a right-sized hydronic or steam boiler, with near-boiler piping, venting, controls, and commissioning.
Ongoing seasonal service to protect your new boiler, hold efficiency, and keep the plant inspection-ready year after year.
All pricing is scoped after an on-site assessment and delivered as a fixed, itemized proposal before work begins.
Business+ plans start at $499/year — includes 2 rtu tune-ups, 15% off all services, and priority scheduling.
Factory-trained technicians for all major HVAC manufacturers









Don't see your brand? We service all major manufacturers! Call us to confirm.
Commercial HVAC service for buildings across the five boroughs and nearby counties
Get answers to common questions about our services
Matching the old nameplate usually carries forward decades-old oversizing, which causes short-cycling, wasted fuel, and premature wear. We run a measured heat-loss calculation for hydronic systems or a connected-EDR analysis for steam, accounting for any building improvements, then size to the real load. Right-sizing is the single biggest driver of efficiency and equipment life on a new boiler.
We plan changeovers to keep heat-off time to a minimum and prefer shoulder-season scheduling when possible. For occupied buildings we can stage the work, set temporary heat, or phase a multi-boiler plant so part of the system stays online.
Yes. Replacing a 60–70% atmospheric boiler — or converting off No. 4/No. 6 oil — with a 90%+ condensing or modulating gas boiler cuts fuel consumption and the associated carbon intensity that Local Law 97 measures. We can model efficiency and fuel-switching options so the replacement supports your building's emissions targets, not just its heating load.
Yes. Electric boilers are drawing real interest across New York City because they burn nothing on site — no combustion, no flue, no fuel storage — so the building reports zero direct emissions from the plant, which is how Local Law 97 counts them. That makes them worth evaluating for buildings where a chimney is failing, where fuel oil is being retired, or where a mechanical room is too tight for a combustion appliance and its venting. The trade-offs are real and worth stating plainly: electricity in New York costs more per unit of delivered heat than gas, so operating cost usually rises unless the building pairs the boiler with a heat pump or runs it as backup and peaking; and the constraint that most often decides the project is electrical, not mechanical — an electric boiler of any meaningful size needs service and panel capacity the building may not have, and the service upgrade can exceed the cost of the boiler. We assess the existing plant and the available electrical service together, size the equipment to the real heating load rather than the nameplate of what is being replaced, handle the installation and controls integration, and coordinate the required permits and inspection. Incentive and utility programs for electrification change often, so we confirm what a specific building currently qualifies for rather than quoting a number that may have expired. Call (332) 600-4640 to have a New York City building assessed.
Commercial boiler installation in NYC requires DOB boiler and work permits, and the unit must pass inspection. We coordinate the permit process, build to code, perform combustion commissioning, and coordinate the inspection and documentation so your plant is legal and your records are complete.
Yes. A boiler failure in heating season is an emergency, and our team responds around the clock. We can stabilize the situation, arrange temporary heat where needed, and expedite a replacement to keep tenants warm and the building occupied.
Absolutely. For owners and managers running heat across several properties, we standardize on common boiler platforms and controls, consolidate boiler-room scopes, and keep a single point of contact for replacements, maintenance agreements, and emergencies. That simplifies parts, training, and budgeting across the portfolio.
Manage a building we've serviced? A quick review helps other NYC property managers and building owners find us.
EPA-certified · factory-trained · fully insured
Our businesses' top picks for heating, cooling & air quality
Equipment services, industry expertise, NYC compliance, and the metro areas we cover.
An aging boiler doesn't wait for a convenient time to fail. Get ahead of it with a measured assessment, a right-sized plan, and a permitted, commissioned installation. Com+ Mechanical serves building owners, property managers, and facility teams across the five boroughs, Nassau, Westchester, northern New Jersey, and Stamford. Call (332) 600-4640 or request a replacement assessment to keep your building warm, efficient, and inspection-ready.
Request a Replacement Assessment